First the first gear hanging into the pit filled base, pay attention to control the height; the upper level meter calibration plane, while the gear is installed on the face of the bolted.
Second the host to install: Before installing rubber shock pad should be fitted in the lower plane of the base and the cement foundation and anchor bolts at the connection between the contact, and then use the box-shaped base level meter calibration plane.
Third Raymond roller mill plumbing fixtures to position and height should be required to install, can not be arbitrarily altered and heightening, the pipe joints should be sealed, can not have leaks after tightening. Electrical equipment should be accurate and reliable, should be carried out after the test machine the parts to be installed.
vertical roller mill: https://www.qualitygrinder.com/grinding-mill/vertical-roller-mill.html